Lock-up is the last point where the roof, external walls, windows and the inside of the frame can all be checked at once. We inspect before the plasterboard is fixed, so anything behind the walls is seen and documented.
- Rated 5.0 from 582 Google reviews by home buyers and owners across Melbourne and Geelong.
- Led by Patrick Dunne, a registered builder with an Advanced Diploma in Building and Surveying.
- Around 12,000 inspections completed, including about 1,100 in the last 12 months.
Building a new home? Book a stage inspection online or call (03) 8797 2639.
Why an independent lock-up inspection matters
Under Victoria’s Building Regulations 2018, your builder must notify the building surveyor at four mandatory stages: before a footing is placed, before nominated reinforced concrete is poured, at completion of the frame, and at completion of the building work. An independent inspection is carried out for you, the owner, and records defects and incomplete work in a report you can give your builder.
Lock-up is not one of those mandatory stages, so an independent inspection is how most owners get this work checked before it is covered.
When should I book a lock-up inspection?
When the roof covering, external cladding or brickwork, windows and external doors are in, and before plasterboard.
What we check at lock-up and pre-plaster
- Roof covering, flashings, valleys, gutters and downpipe falls
- Brickwork or cladding, weep holes, articulation joints and lintels
- Windows and external doors fitted square and sealed
- Sarking and wall wrap intact, insulation installed where required
- Wet-area framing and preparation for waterproofing
- Visible plumbing and electrical rough-in positions against the plans
Where the roof cannot be walked safely, it can be photographed with our drone roof inspection.
What problems does a lock-up inspection catch?
Lock-up is when the home is closed against the weather, so roof flashings, window seals, wall wrap and cladding details all matter. The Victorian Building Authority’s 2024-25 annual report names water ingress as one of the most common building defects found during its inspections, and many of the places water gets in are visible at lock-up and hidden afterwards.
What happens after the lock-up report?
You receive a photographed list of items to raise with your builder before the plasterboard goes up. Anything that needs fixing can be corrected while the frame and services are still exposed.